Breathable waterborne epoxy self-leveling KERASEAL WB40
1.1. Requirements for labor protection work |
– During application, workers must wear full labor protection (hat, clothes, shoes, glasses, mask, and gloves). |
1.2. Requirement for moisture |
– Substrate moisture content < 18%. – Max. substrate temperature 39ºC. – Construction areas require good ventilation. |
2.1. Mixing KERASEAL WB50 |
– Include composition A and composition B. – Using specialized mixer, approx. 600 rpm with a suitable mixing paddle. – Add the composition B to the composition A and mix a further 3 minutes until homogenous (may take a longer depending on weather conditions and equipment). |
2.2. Mixing KERASEAL WB40 |
– Material includes 2 components: Composition A and Composition B. – Add the composition B to the composition A mix a further 3 minutes until homogenous.
|
3.1. Surface cleaning and treatment |
– The surface ensures no dust, dirt, oil. |
3.2. Applying KERASEAL WB50. |
– Using long-hair roller to spread KERASEAL WB50 on the cleaned surface. |
3.3. Applying the basecoat KERASEAL WB40 |
– For the basecoat that requires a high thickness, apply the coat by coating method. Spread KERASEAL WB40 on the area to be applied with a specialized brush, finish the surface with serrated brush and spiked roller. BC1 powder can be added to material to increase the hardness of the coating. |
3.4. Applying the topcoat KERASEAL WB40 |
– After the basecoat completely dries, use the scrubber with suitable sandpaper, sanding the entire surface to create roughness and remove impurities. |