Epoxy slurry resurface KERACRETE RM150
| 1.1. Requirements for labor protection work |
|
– During application, workers must wear full labor protection (hat, clothes, shoes, glasses, mask, and gloves). |
| 1.2. Requirement for moisture |
|
– Substrate moisture content < 6%. |

| 2.1. Mixing KERASEAL PS60 |
|
– Material includes composition A and composition B. |
| 2.2. Mixing KERACRETE RM150 |
|
– Material includes 3 components: Composition A, B and C. |

| 3.1. Surface cleaning and treatment |
|
– The surface ensures no dust, dirt, oil and other impurities. |
| 3.2. Applying KERASEAL PS60 |
|
– All positions applied KERACRETE RM150 must be primed with KERASEAL PS60 first to increase adhesion between material and concrete surface. |

| 3.3 Applying KERACRETE RM150 |
|
– Use a steel trowel or putty to fill the material in the position to be applied. It can be filled several layers for maximum effect. |
| 3.4. Notes during application |
|
- Because the curing time of the material is very fast, it is recommended to note that the mixing volume should be applied in a short time to avoid waste. |




