High-build anti-static floor coating KERACOTE EC100
1.1. Requirements for labor protection work |
– During application, workers must wear full labor protection (hat, clothes, shoes, glasses, mask, and gloves). |
1.2. Requirement for moisture |
– Substrate moisture content < 6%. |
2.1. Mixing KERASEAL PS60. |
– Material includes composition A and composition B. |
2.2. Mixing other materials |
– Material includes 2 components: Composition A and Composition B. |
3.1. Surface cleaning and treatment |
– The surface ensures no dust, dirt, oil. |
3.2. Applying KERASEAL PS60 |
– Using long-hair roller to spread KERASEAL PS60 on the cleaned surface. |
3.3. Applying the conductive primer KERASEAL PSC |
– Cleaning and remove dirt, impurities on the primer surface KERASEAL PS60 before applying KERASEAL PSC. |
3.4. Applying the topcoat KERACOTE EC100 |
– Depending on the required reactance to choose the suitable materials. |